238
Overview of the Florida DEP Process
The Florida Department of Environmental Protection (DEP) is the state's primary agency for environmental regulation, stewardship, and permitting. It oversees activities that could impact Florida's air, water, land, and natural resources, ensuring compliance with state and federal laws like the Clean Water Act and Clean Air Act. DEP's permitting processes are designed to protect ecosystems while allowing responsible development, such as construction, dredging, filling, and stormwater management. Permits are often joint with Florida's five water management districts (e.g., Southwest Florida Water Management District) or delegated local governments.DEP permitting is most relevant for projects involving environmental alterations, like marine construction, wetlands, stormwater systems, or air emissions. The process varies by project type but generally follows these steps:Key Types of DEP Permits
Environmental Resource Permit (ERP): Regulates dredge/fill activities, stormwater management, wetland impacts, and surface water alterations (under Chapter 373, Florida Statutes). This is common for docks, boathouses, and coastal projects.
Air Construction/Operating Permits: Required for new or modified pollution sources (e.g., industrial facilities) under the Clean Air Act.
National Pollutant Discharge Elimination System (NPDES) Permits: For wastewater or stormwater discharges to surface waters.
State 404 Permit: DEP's assumed federal authority for dredge/fill in state waters (replaces U.S. Army Corps of Engineers permits in many cases).
General DEP Permitting Process
Pre-Application Consultation (Recommended): Contact your local DEP district office or water management district to determine if a permit is needed. Use tools like the DEP Business Portal or ERP Online Help for guidance. Some small projects (e.g., single-family docks) qualify for self-certification exemptions—no formal permit required if criteria are met (e.g., no wetland impacts, designed by a Florida-licensed engineer).
Application Submission:
Submit via the DEP Business Portal (online) for efficiency, including forms like the ERP Joint Application, site plans, and environmental assessments.
Fees vary (e.g., $2,850 for NPDES; discounts for electronic submissions).
Paper submissions go to the relevant district office.
Include certifications from a Florida-registered professional engineer (required for most non-renewals).
Review and Public Notice:
DEP reviews for completeness (30-60 days initially).
Complex projects may involve public notices, agency coordination, or additional data requests.
Processing time: Weeks for simple general permits; months for individual permits (e.g., 60-150 days for ERPs).
Issuance or Denial:
If approved, permits include conditions (e.g., mitigation for wetland impacts).
Track status via the Permitting Application (PA) system or Water Permitting Portal.
Compliance and Reporting:
Post-construction: Submit as-built plans, monitoring reports (e.g., turbidity), and annual renewals.
Violations can lead to fines or stop-work orders.
Recent laws (e.g., 2023 updates) have streamlined processes, introducing "ten-two" general permits for qualifying stormwater systems and faster self-certifications. Always check exemptions first to avoid unnecessary applications.For project-specific details, visit the DEP website (floridadep.gov) or contact a district office.How JSC Contracting Inc Can HelpJSC Contracting Inc., a family-owned, licensed general contractor (License #CRC1332267) based in Central Florida (Ocala/Belleview area), specializes in marine construction, new builds, remodels, and property improvements. With roots in acquiring Labagh Marine (established 1984), they bring over 34 years of combined expertise in Florida's waterfront projects, serving counties like Marion, Sumter, Lake, Citrus, and Brevard.JSC can streamline the DEP process for clients by:
Guiding Pre-Permitting: Their team, including project managers like Alex (owner) and Steve (new construction lead), assesses projects for ERP exemptions or self-certifications (e.g., single-family docks). They coordinate with DEP districts to confirm requirements early, reducing delays.
Application Preparation and Submission: As certified contractors, they handle engineering certifications, site plans, and electronic submissions via the DEP Portal. This ensures compliance with rules like no adverse water quality impacts or wetland disturbances.
Construction and Compliance: They build DEP-permitted structures like custom docks, boathouses (with gable/hip roofs), seawalls, and shoreline stabilizations using durable, eco-friendly materials. Post-permit, they manage as-builts, monitoring (e.g., erosion control), and reporting to avoid violations.
Full-Service Project Management: From design to completion, JSC handles communication, material sourcing, and quality control. Client testimonials highlight their professionalism, on-time delivery, and exceeding expectations for dock builds and remodels.
By partnering with JSC, clients avoid common pitfalls like incomplete applications or non-compliance, saving time and costs. For a free estimate or DEP consultation, contact us at jscfla.com or (352) 687-2030.