230

JSC Contracting Inc:

Expert Dock Construction Services for Florida Waterfront Living Florida's 1,350 miles of coastline and thousands of lakes make waterfront property a dream—but without a solid dock, it's just a view. JSC Contracting Inc, rooted in Ocala's marine heritage since acquiring Labagh Marine in 2020, builds custom docks that withstand hurricanes, surges, and daily use while enhancing your lifestyle and property value. With over 34 years of combined expertise, a top 1% BuildZoom score of 144, and license CRC1332267, JSC turns your shoreline into a functional, beautiful extension of home—perfect for boating, fishing, or sunset lounging. From fixed piers to floating platforms, JSC handles every detail: permitting, piling installation, decking, and resilient upgrades that meet FBC 8th Edition, DEP, and FEMA standards. Their family-owned team has completed 100+ marine projects in Central Florida (Marion, Lake, Sumter, Citrus, Brevard), earning praise like: "JSC built our dock and seawall flawlessly—on time, on budget, and built to last."

Why Build a Dock with JSC? Protection + ParadiseA well-designed dock does more than hold your boat—it protects your shoreline, increases usability, and boosts resale value by 15–25% in waterfront markets. Key benefits:

  • Storm Resilience: Engineered for 150+ mph winds and 10–15 ft surges (Ian/Idalia-proof).

  • Erosion Control: Integrates with seawalls to stabilize banks.

  • Low Maintenance: Uses composite decking, galvanized hardware, and UV-resistant materials.

  • Insurance Savings: FEMA/NFIP credits for elevated/open designs (up to 40% off premiums).

  • Eco-Compliance: DEP-approved designs minimize habitat impact.

JSC’s Dock Construction Services: Tailored to Your Water

Dock Type

Best For

JSC Features

Cost (per sq ft)

Fixed Pier Dock

Lakes, calm canals

Helical pilings, Trex composite decking, handrails

$75–$120

Floating Dock

Tidal rivers, fluctuating levels

Polyethylene floats, aluminum frame, modular

$90–$150

Boat Lift Dock

Powerboats, sailboats

4–8 pile lift, remote control, 10K–30K lb capacity

$15K–$40K add-on

Kayak/Paddleboard Launch

Recreation

Low-profile ramp, non-slip surface

$3K–$8K

Multi-Level Platform

Entertaining

Upper sun deck, lower swim platform, LED lighting

$100–$200

JSC Standard: 304 stainless steel hardware, FL# approved materials, BFE+2 ft elevation

The JSC Dock Build Process: From Permit to Paddle

  1. Site Survey & Design (Week 1)

    • Bathymetry scan, soil test, wave analysis

    • 3D renderings + DEP ERP permit prep (Ch. 403, F.S.)

  2. Permitting & Approvals (Weeks 2–4)

    • FDEP Environmental Resource Permit

    • Army Corps of Engineers (Section 404) if needed

    • Local zoning (setbacks, height limits)

  3. Piling & Foundation (Week 5)

    • Helical piles (12,000+ lbs uplift) or driven timber

    • Concrete caps for stability

  4. Framing & Decking (Week 6)

    • Galvanized stringers, hidden fasteners

    • Trex Transcend or TimberTech (25-yr warranty)

  5. Finishing Touches (Week 7)

    • Aluminum ladders, cleats, bumpers

    • Solar LED dock lights, fish cleaning station

  6. Final Inspection & Handover

    • CO issued, as-built survey, 1-year warranty

Timeline: 6–10 weeks | JSC handles ALL permits

Florida Dock Regulations (2025 Guide)

Rule

Requirement

FBC 3109

Coastal docks = breakaway or elevated

DEP ERP

Mandatory for >500 sq ft or pile driving

CCCL

Seaward of control line = frangible design

FWC

No wake zones, manatee protection

Local

Marion: 10 ft setback

JSC Pro: 100% compliance → no fines, full insurance coverage

Storm-Resilient Dock Upgrades (JSC Specialties)

Upgrade

Benefit

Cost

Quick-Release Mooring

Boat floats free in surge

$800

Breakaway Gangway

Collapses safely

$1,200

Pile Wraps (PVC)

Prevents marine borer damage

$15/ft

Solar Charging Station

Powers lift + lights

$2,500

Real JSC Dock Project: Lake Weir, Marion CountyChallenge: Eroding shoreline, shallow water, hurricane risk
JSC Solution:

  • 80 ft fixed pier on helical pilings

  • Trex decking + aluminum rail

  • Integrated 12K lb boat lift

  • DEP permit in 3 weeks
    Result: Zero damage in Milton (2024), $1,000/yr insurance savings, property value +$60K

Your Dock Construction Checklist

Task

Done?

Water depth measured

Shoreline stabilized (seawall?)

Boat type/size known

DEP permit prepped

Storm upgrades selected

JSC free consult booked

Build Your Waterfront Dream with JSCJSC Contracting Inc doesn’t just build docks—they build lifestyle assets that survive Florida’s worst and shine in its best. Contact us at 352-687-2030 or check out our website at www.jscfla.com.

Previous
Previous

230

Next
Next

229