Installing an RV Hook UP at your home.
Assess Your Needs and Site:
Determine your RV’s requirements: 30-amp (3,600 watts) or 50-amp (12,000 watts) electrical service, water pressure needs, and sewer access.
Choose a flat, accessible location on or near the concrete driveway, ensuring the pad is 4 feet wider and longer than your RV (e.g., 10x30 feet for a 26-foot RV).
Confirm the driveway’s thickness (5–6 inches with rebar for heavy RVs) and ensure utilities won’t be trenched under the slab to avoid cracking.
Check Local Regulations and Obtain Permits:
Contact your local municipality (e.g., Central Florida county offices) to verify zoning laws, building codes, and restrictions on RV hookups or long-term parking.
Secure necessary permits for electrical, plumbing, and sewer work. Some areas may restrict RV use as a dwelling or require specific setback distances.
Call 811 or your local utility locator to mark underground lines (water, gas, electric) to avoid damage during digging.
Plan the Concrete Pad (if Expanding or Modifying):
If adding a new pad or extending the driveway, hire a contractor like JSC Contracting, Inc. 352-687-2030, jsccontractinginc@gmail.com for a 5–6-inch thick slab with wire mesh or rebar for RV weight.
Ensure proper base preparation (4–6 inches of compacted gravel) and slope for drainage (1–2% grade away from the RV).
Position the hookup post off the slab to avoid cutting concrete later for utility lines.
Install Electrical Hookup:
Hire a licensed electrician to run a dedicated circuit from your main panel to an RV pedestal or weatherproof outlet box on a 4x4 post set in concrete.
Use appropriate wiring (e.g., 10/3 cable for 30-amp, 6/3 for 50-amp) buried in a 24-inch deep trench (per NEC codes) with conduit for protection.
Install a GFCI breaker and ensure the outlet is on the driver’s side of the RV, 3–4 feet high, for easy access.
Set Up Water Hookup:
Dig a trench from your water source to a 4x4 post near the pad, using CPVC pipe for potable water, buried below the frost line (if applicable; minimal in Central Florida).
Install a freeze-proof sillcock or spigot with a backflow preventer and secure it to the post with pipe clamps.
Add a water pressure regulator (40–50 psi) and filter to protect the RV’s plumbing. Use a white, food-safe hose for connection.
Arrange Sewer Hookup (if Needed):
If your property has a septic system or sewer cleanout, connect a 4-inch PVC pipe to a capped outlet near the pad, sloped at 1/4 inch per foot for drainage.
If no sewer access exists, install a dedicated RV septic tank (500–1,000 gallons, $2,000–$6,000 installed). Verify local regulations for dumping restrictions.
Avoid constant sewer connection to prevent clogs; use a slinky hose for periodic dumping (weekly for full-time use).
Hire Professionals and Test the System:
Engage professionals for complex tasks: a concreting company like JSC Contracting for the pad, a licensed electrician for power, and a plumber for water/sewer.
Total costs range from $430–$1,000 for DIY (basic materials) to $3,000–$12,000 for professional installation, depending on utility proximity and pad size.
Test all hookups: check electrical voltage, water pressure, and sewer flow to ensure functionality and compliance before parking the RV.
Additional Considerations
Timing: Plan for 1–2 weeks for permitting and 1–3 weeks for installation, depending on contractor availability and complexity.
Safety: Avoid DIY electrical or sewer work unless experienced, as errors can lead to shocks, leaks, or code violations.
Central Florida Context: Coastal areas may require corrosion-resistant materials (e.g., stainless steel for spigots) due to salt air. Check with JSC Contracting for local expertise.
Maintenance: Seal the concrete every 3–5 years and inspect hookups annually for wear or leaks.
For a tailored quote, contact JSC Contracting, Inc. 352-687-2030 or jsccontractinginc@gmail.com for a free estimate.